Elevate were proud to work with Downer group in supplying their lifting gear requirements for the construction of one of the largest wind farms in Australia. The Ararat, Victoria farm has 75 turbines producing 240MW. Downer, a leader in renewable energy in Australia, worked closely with HES’ staff in Melbourne to ensure seamless supply of not only standrad product but engineered lifting beams, large capacity syntethic slings and specific ancillary lifting products. HES’ engineering capabilities as well technical expertise were an invalauble partner in this large scale project.